Agree with everything.
Clarification - Mine is still in D1. Point of my previous post was that my dealer was pissy with me for continuing to ask him about it.
I would guess that mid-week they start up the plant with the intent of running Tungstens. I bet they start with a couple and begin ramping up similar to what they've done with other trim levels. Their priority will probably be sold orders (ours).
I can't see them not weaving in the Limiteds with Level A though. I just don't know what that will look like. However, considering all of our (Tungstens) estimated ship dates are within the first 2 weeks of August, I bet they do both at the same time.
Comments from the CEO lead me to believe that they've been letting the plant do these slow ramp ups to gain efficiencies. I have a feeling that, based on comments from dealerships, he's swung too far towards operational efficiencies and will swing back a little towards supporting dealerships. In other words, the plant will probably have to deal with quicker ramp-ups or simultaneous ramp ups. However, not to the extent that it's had to deal with in recent years.