I ordered a hydro blue Rebel back in April. My options for it are the monotone paint, luxury leather red bucket seats/interior, advanced safety group 2, technology group, 33 gallon tank, air suspension, bed utility group, tonneau cover, sunroof, black side steps, trailer brake control and Rebel 2 equipment group. It was put on restriction until May 13th when it went to BA. It went to D on June 14th where I was given a VIN, D1 on July 2nd and finally went to E,F and G on July 26th. It went to I, J and JB on July 29th and then to KZ on August 15th where I was able to see my window sticker and then to KZM on August 17th where I have been stuck in ever since. I had a delivery date of October 9th but that changed to TBD and hasnt changed. I saw that a list was created with VIN numbers and dealers trucks were sold at, etc. If the original poster wants to add me to the list, let me know.