Yeah and I'd be surprised if they're at full output right away too. I'd say we have 3 weeks minimum before they start pumping out the higher trims. When they do, they're gonna PUMP.Some of us think the pause began in January But yeah June 3 for start up.
Hopefully!Yeah and I'd be surprised if they're at full output right away too. I'd say we have 3 weeks minimum before they start pumping out the higher trims. When they do, they're gonna PUMP.
I am guessing the screens came in then.Received a VIN today for my '25 Tungsten. Order was placed on Feb 12th. Still waiting patiently.
You've been able to order Tungsten since January.ok, don't get my hopes up. seriously, I had thought if I couldn't even order my Tungsten by end of May, I was going for something else. Do y'all really think the Tungsten orders might open up after the pause? I'm all for wishful thinking, but it's getting to be a little crazy at this point. If the mother ship (Ram, Stellantis,....) would just pass along a LITTLE information, it would go a long way to help with loyalty.
It was open for a long time, but for over a month the Tungsten trim has been restricted. At least this is what Anthony from Mark Dodge is telling me.You've been able to order Tungsten since January.
Somewhere around April 24th - it is restricted for ordering. The dealers cannot place an order for it. Much like the Level A group on the Limited. And the Forged Blue Metallic and Steel Storm colors.Ohh I didn't realize that. Restricted how?
I would say probably the latter Pete as I am sure they are getting the message those that have ordered are not happy almost 6 months later.Yikes.... That's not good. Either they've received significantly more orders than they expected or they're not wanting to **** off too many people due to significant part availability problems. Hopefully I'm wrong!
no build date information soon and I am jumping ship, 6 months is longer than I have ever waited for an ordered truck in over 20 years and that's just ridiculous.The reality is no matter when you ordered if you ordered a limited or tungsten it’s most likely not coming until July/August. I sympathize with those who have been waiting a couple months for any word but the fact is they didn’t even start production of the HO until mid March if I remember correctly. Combine that with the fact that they’re apparently having issues with getting parts still. IF production starts in June on our trucks we’re looking at mid July-early August. Now I’d hope for sooner but I’m not gonna get my hopes up.
I’m not gonna pretend I know the ins and outs of vehicle manufacturing but like I said above they announced they wouldn’t start making the HO engine until mid March they’ve been making them for roughly 2 months now they’ve made the engines during those two months they didn’t manufacture many limiteds with limited longhorns and regular limiteds nationwide they’re building 157 trucks right now all of them without the limited level 1 package. Approximately 100 of those 157 trucks started being build last Thursday and today starts a 2 week shut down which ends on June 3rd.no build date information soon and I am jumping ship, 6 months is longer than I have ever waited for an ordered truck in over 20 years and that's just ridiculous.
they have had plenty of time to have the parts for the sold trucks in my opinion. not that much has changed on them except for the tungsten. there is no excuse for this in my opinion to make people with orders sit this long and watch them fill dealer lots with trucks that will in most cases sit months before being sold.
Mybe it's an omen telling me that I should have just stayed with GM even though they ticked me off.