Awesome - thanks! Thousands of Ram owners would be lost with you, @triple_BOf the 84 members with built trucks already they had a D1 (Scheduled) to E (Frame/Start of Production) average of 18 days so with the holidays I would say you are looking at January
However, the shortest was a 5 day turn around, longest so far is a 25 day.