3/12 and 744940, my truck got built yesterday and is out getting BUG installed.ordered 3/9 and 707787, we're 25 apart. What is your status? Lat week i flipped from "gathering parts" to "sequencing build"...
Sent from my SM-N950U using Tapatalk
3/12 and 744940, my truck got built yesterday and is out getting BUG installed.ordered 3/9 and 707787, we're 25 apart. What is your status? Lat week i flipped from "gathering parts" to "sequencing build"...
So my lane keep doesn’t beep at me when I use my turn signal to change lanes...Lol. That’s great. Stay in lane option is annoying anyway. I had a loaner that had it and every time you switch lanes the beeping makes you think your about to crash. I ordered my new rebel without that option too. Also I can park my self
You called that one! lol. Generic email telling me the same thing and then saying they will follow up in 2 weeks.Agreed. You just get some workflow-driven template email that echos Ram Chat’s update. Then, several weeks later you get another template Email. It’s really BS and a waste of time.
I'm 3/18. I was going to reach out to RAM Chat on the 8 week mark which would be Thursday of next week.ordered 3/16 746170 currently D1
Adam, check-in with Aaron. You are a week or 2 ahead of me. My 3/31 order is being built now and at the body vendor.I'm 3/18. I was going to reach out to RAM Chat on the 8 week mark which would be Thursday of next week.
EDIT:
I decided what the Hell, I'll check anyway
"I am showing all of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly."
746303
My 3/4 order hasn't started yet either.Ordered rebel on 4/8 and ram chat just said same bullcrap. Waiting on parts to build. Scheduling phase. I thought since you guys rebels were on the line I would have had a shot
Shipping Status:I just got an update from the dealer, Status is KZP - only know KZ (released by plant and invoiced) not sure what the P stands for. Does anyone know?
The dealer said that should arrive at the dealership in 7-10 days.
It's been a long wait 14 weeks as of today, but it seems so close now.
VIN: 689289
Thanks! had found a code list, but KZ-P was not on the list.Shipping Status:
KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ-P - Arrived Ship - Thru Body Vendor
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction
You might have run into the same issue that I did. I ordered 2/28 -- just a few days before you. RAM told me that all parts were gathered on 4/16. However, when I used RAM Chat today, they said that I reached my current status on 4/30. It is as if they reset my D1 state to be 2 weeks later. They also said that it can stay in current status for 30 days.My 3/4 order hasn't started yet either.
Dealer Update:I'm 3/18. I was going to reach out to RAM Chat on the 8 week mark which would be Thursday of next week.
EDIT:
I decided what the Hell, I'll check anyway
"I am showing all of the materials needed to start the build process have been received. The vehicle should be entering the build process shortly."
746303