your lucky mine was sequenced for production 2 weeks ago & is still in that status mine was ordered on 1-13-21Got my build sheet yesterday. Don’t think it’s gonna make it before my bonus cash code expires on the 25th.
- 12/21 ordered, VON given with POC order sheet
- 12/28 - VIN, Ram chat said in scheduling phase, 7-9 week build process estimate
- 01/21 - email from [email protected] saying vehicle will arrive week of 2/7
- 01/22 - Ram chat said still in scheduling phase
- 01/22 - dealer said still in D status
- 02/01 - Ram chat said “all the required materials for your order have been gathered and the plant has sequenced your order for production”
- 02/05 - Ram chat said “currently in the paint stage”
- 02/08 - Ram chat said “has been built and is pending installation of additional equipment”
- 02/08 - build sheet
sounds like serious damage and they are waiting on parts or it got shipped to the wrong dealer bummer . large companys dont realize time frames affect other people down the line or they just dont care . i get 90% of my bids by just showing up on time & returning to do the work on time. all referrals for meI’m seriously considering buying something else. I picked up my F-150 they were holding till my Ram comes in and gave them my crappy Hyundai instead to trade because I need a truck where I am. If this isn’t here by the end of the month, I’ll just get some other vehicle from somewhere else, ridiculous. 26 days in inspection either implies it’s been lost/forgotten or there is something really wrong with it.
they told me they weren't aware of a chip shortage hahaI ordered on 1/20. I just got off chat with Ram regarding my build. I got the "I am showing we have all the parts for the order and waiting for the order to hit the line to be built. I would need to recommend chatting back in later this week for another update on the order." response. I asked specifically about the chip sourcing issue and they said it won't affect my build. I guess we will wait and see.
thats good news i like to hear that. their seams to be no pattern on build times at all
dang man... i ordered 1/9 and our trucks are almost identical... i went with granite monotone but other than that... congrats!!! i'm still in scheduling :/Mine is here today (haven't picked up or inspected). Went super quick and has all the options. Sorry it's not the same for many of you. I didn't do anything different than what you all are doing so no idea why:
1/14 - Ordered
1/16 - VIN/VON
1/22 - D1
2/2 - F (Paint). Still ESD of 2/4 on POC
2/3 - JJ (Body vendor options)
2/4 - KZ (Staged for shipment)
2/5 - Shipped
2/9 - Arrived at dealer (Chicago area)
Well I'd know if it was shipped to the wrong dealer, It never left the factory since the 14th of January. It may have had something happen to it. Im giving them till my bonus cash runs out, otherwise I'm going somewhere else for something else, sad.sounds like serious damage and they are waiting on parts or it got shipped to the wrong dealer bummer . large companys dont realize time frames affect other people down the line or they just dont care . i get 90% of my bids by just showing up on time & returning to do the work on time. all referrals for me
doesnt look like it effects the longhorn or limited for nowSemiconductor Chip Shortage Causes Ram To Repackage Some Options:
Due to the global wide semiconductor chip shortage, the chip-reliant automotive industry has been struggling to make adjustments to its manufacturing operations to ensure that production won't slow down. Demand for these chips soared during the pandemic as people snapped up game consoles...5thgenrams.com
probably a long time to delivery. i doubt they would change ur orderAnyone know what this means for a Laramie order with Level 2 package ordered 1/22?
Im in the same boat. Laramie level 2, with advanced saftey group. ordered 2/1 and i have vin as well. Hoping that it doesnt delay.Anyone know what this means for a Laramie order with Level 2 package ordered 1/22? I do have a VIN.