I plan to but depends on Stellantis, currently they have stopped the ability to do future orders so as of today I will not be able to but that may change once production actually starts??I need to ask again, will you be doing a production for MY2024? I received my VIN today, and it is scheduled for production.
Currently No, Stellantis has stopped build sheets on future year models as of today. 2024 and 2025 Build Sheets that I had found in the past now say VIN NOT SUPPORTED which is a new status that I have never seen before so unless that changes when 2024 production begins I may not be able to continue.@triple_B
can you help this poster?
I need to ask again, will you be doing a production for MY2024? I received my VIN today, and it is scheduled for production.
@triple_B
can you help this poster?
this would suck big time if stellantis stops us from seeing build sheets.Currently No, Stellantis has stopped build sheets on future year models as of today. 2024 and 2025 Build Sheets that I had found in the past now say VIN NOT SUPPORTED which is a new status that I have never seen before so unless that changes when 2024 production begins I may not be able to continue.
THANK YOU! I will do that now.I did just create a 2024 registration form though so go ahead and register your order and I will continue to check!
2024 REGISTRATION
He stated above he can't start it until production starts. Register, and when it starts, you will be on.When are you starting something similar for 2024 builds?
Got it.He stated above he can't start it until production starts. Register, and when it starts, you will be on.
Last I heard a few days ago, it was still scheduled for 8/2.Got it.
Added my vin. Cannot wait to get schedule production status- I keep checking no update.
Anyone have idea when production actually will start? I keep hearing sometime in August but not confirmed. I have 2 trucks on order so hopefully both get done around same time.
The run production by group number. The group number is the first three of the last six number of the vin. My trucks group is 111, and that group got scheduled on 7/15. Last time I ordered, time from schedule, to actual production was about 2 or three weeks. Mine must be getting built in the first couple days of production.Got it.
Added my vin. Cannot wait to get schedule production status- I keep checking no update.
Anyone have idea when production actually will start? I keep hearing sometime in August but not confirmed. I have 2 trucks on order so hopefully both get done around same time.
Isn't that odd, to change over mid week? Is the plant shutting down, then restarting that day, or running 23s one day, and 24s the next?Last I heard a few days ago, it was still scheduled for 8/2.
Here’s what was stated on the TRX forum.Isn't that odd, to change over mid week? Is the plant shutting down, then restarting that day, or running 23s one day, and 24s the next?
So I’m group 110The run production by group number. The group number is the first three of the last six number of the vin. My trucks group is 111, and that group got scheduled on 7/15. Last time I ordered, time from schedule, to actual production was about 2 or three weeks. Mine must be getting built in the first couple days of production.
The 100 group is the lowest group for 2024. And while Ram makes generall passes through the groups, they never complete a group during those passes. They build maybe 70-80% of the trucks in a group, and keep moving forward. They build the rest whenever they get around to it.So I’m group 110
Assuming that would be first round of production.
Still waiting on my second trucks vin number.
Let’s see when that one is.
They don't run them in order. It's random. Nobody has figured it out. The status will show scheduled, a couple weeks before production.So I’m group 110
Assuming that would be first round of production.
Still waiting on my second trucks vin number.
Let’s see when that one is.
Somebody had a meme about 20 pages back, of the guys throwing darts, to pick which group would build next. At 170 pages, it's good a new thread will be starting for MY24.So I’m group 110
Assuming that would be first round of production.
Still waiting on my second trucks vin number.
Let’s see when that one is.
People did order 22s, and got 23s, but that was probably due to parts shortage, not getting parts until after changeover. Changeover is subject to change.My MY23 has been stuck in D1 status since 6/15. I guess if 8/2 is the changeover date then I know the last date it could possibly be built. Unless they push the changeover date out.