6of36
Spends too much time on here
I was scheduled 7/15, it's now 8/18, and I don't have an estimated build date yet. As a matter of fact, it moved to D1, and then back to D.We dont have enough 2024 orders so far to see how the averages play out, but near the end of 2023 production I was seeing the scheduled to production date to range from 1 to 3 weeks with the average being closer to the 3 week range.