I know I’m beating a dead horse with what’s already been said here multiple times, but it amazes me how there’s just no rhyme or reason to the production timing and sequencing here. To some extent it’s to be expected with supply/parts shortages and varying builds with different options, but it obviously goes way beyond that. I ordered on 1/4/22 and got VIN assigned right away with a VIN in the 268 range. I’m in D1 with a current ESD of 3/17/22. We’ll see if that actually happens or not. Considering how many of these are moving so slowing from BS to WS and that I don’t have a BS yet, I’m not overly confident. Looking at the tracker and seeing how many VINs earlier than mine still aren‘t in production and then how many VINs after mine are through production with WS just makes me crazy. I also have a Jeep Wrangler 392 on order with VIN asssigned in D status and I’m told I’ll be lucky if that gets built by end of summer to early fall. Yikes.