Just a quick bit of statistics for everyone.  I'm tracking 186 members in this forum, and so far 12 have gotten build sheets.  Here's a chart showing the haves/have-nots by trim level (as provided to me).  I'm not 100% sure I've captured all of the 10th Anniversary Limiteds, as opposed to regular Limiteds.  But it's still interesting data nevertheless.
Green = have a build sheet
Red = still waiting for a build sheet
EDIT:  This makes it about 6.5% of the members who have received build sheets.  Based on 
@triple_B's posts, SHAP has issued about 5,500 build sheets (on a total list of about 85,000).  So they've built about 6.5% of their backlog.  Comparing that data, it would suggest that "sold orders" aren't taking any more priority than all other orders.  But take that with a grain of salt, as it's a limited dataset.