You're not cutting it close. Build only take a couple days. Strike is two weeks out. Shippers are not striking.One step closer. Really hope it’s on the way be for the possible strike. Cutting it close.
You're not cutting it close. Build only take a couple days. Strike is two weeks out. Shippers are not striking.One step closer. Really hope it’s on the way be for the possible strike. Cutting it close.
I'm at 30 days now. No VIN. Even AA gives you a token for 30 days....
Things are shaping up for my build
Im.with you. I'm over here waiting for a VIN and I see he's in production and ordered a week AFTER I did? I'm happy for cumminsfan and all but like um... da fu.....Wow that's fast! 5 days to get VIN after order confirmation??
That's actually normal, after they are in production. You and I both ordered before production started, so when they started assigning VINs, there was a backlog. He got the luck of the draw of getting built fast. They get built in random order, not by when they were ordered.Wow that's fast! 5 days to get VIN after order confirmation??
That's actually normal, after they are in production. You and I both ordered before production started, so when they started assigning VINs, there was a backlog. He got the luck of the draw of getting built fast. They get built in random order, not by when they were ordered.
As long as it's not as bad as 23s. Due to the whole pandemic debacle, they didn't start 23 production until after Thanksgiving. I saw one person who ordered in September, who didn't get his truck until May. Of course with the strike, we could be there.My bad luck never fails...
I'd shoot myself.As long as it's not as bad as 23s. Due to the whole pandemic debacle, they didn't start 23 production until after Thanksgiving. I saw one person who ordered in September, who didn't get his truck until May. Of course with the strike, we could be there.
Oh, don't be a party pooper... Think positively... Strike won't happen.Two days ago I was notified by my dealer that I was in D1 status......y'all think my build will make it before the strike happens?
not to bust your bubbleHopefully soon, I'll have some current timeline info for everyone.
My Ordered/VON/C-status date was 7/28/23.
My Scheduled/VIN/D1-status date was 08/18/23.
My dealer tells me that my truck will be Shipped by 09/17/23. Not sure how he knows that, but says he does.
My 2023 Laramie G/T ordered in May took 7 days from In Production to Built and 2 days from Built to Shipped, so if that timeline were the same, my Built would be ~9/15/23 and my In Production would be ~9/08/23.
When I pointed out that the 9/14/23 strike date could jam up my truck, he pointed out that it would off the line and out to Tier 1 for bedliner, floorboards, G/T decals...and they aren't UAW workers.
Cutting it too close for my comfort!!
He did also point out that these strikes usually aren't "dead stop" strikes for the line because all parties know that stranding the line makes life miserable for everyone when a potential strike ends.
Not sure if any of that makes me (or probably anyone else here) feel any better!
If my dealer is correct, in about one week, I may have some insight for you all as to how the schedules are currently running.
"Dis is a bummer, man!"not to bust your bubble
but
I have been involved in strikes at uaw plants in the past
when the strike is called everyone stops what they are doing and clocks off and walks out the door.
Hate to be a downer, but I wouldn't get your hopes up too much. As others have said in the past, the build order once you're 'scheduled' is very unpredictable so you could get lucky, but my Limited was ordered 7/6, scheduled 7/26 and is still waiting to go into production a month later. At this point, I'm fully expecting to be delayed by the strike if it happens. Absolutely nothing to do about it but wait though...Just got my VINs assigned! Added both to the tracking sheet...
Other than that, so excited! I was not expecting anything until October/November so possible delivery in September is AMAZING!
It may, but I wouldn't hold my breath. We are down to two weeks.Two days ago I was notified by my dealer that I was in D1 status......y'all think my build will make it before the strike happens?