Anthony is using my truck. I keep in contact with him. He is the greatest.So mine was “Scheduled” same day as yours (30 Sep). How did you find out the date yours is to be built? Mine is still showing in D1 status.
Sent from my iPhone using Tapatalk
Mine was scheduled 11 days before yours. So if you counted 42, I'm at 53. When you order before production starts, you have to expect it will take a while. Production just started a month ago, with thousands of orders.I wish that were always the case...42 days since D1 ("scheduled") and counting...**sigh**
I was wondering if you noticed that lolAnthony is using my truck. I keep in contact with him. He is the greatest.
try via this link:Is anyone else "In Production" right now? And, are you getting any updates from the 2024 Production Updates that is supposed to be from the GoogleDoc? I submitted my info, but have gotten anything so far.
I watch everything you post. I have those last 6 memorized, along with VON.I was wondering if you noticed that lol
I've been checking that sight now also. It has more data than the Ram one, but only says E-In Production. I had thought that the Google Doc was going to get more precise updates..like F-status, G-status, etc.try via this link:
WaitingForJeep.com
Track your custom orders and get alerted as it moves from one stage to the next.waitingforjeep.com
I signed up to the doc as well, but haven't seen anything. My understanding is that by providing the VIN, you'll be notified whenever your VIN is flagged going through the stages. I didn't get any updates when my order went from Confirmed to Scheduled.I've been checking that sight now also. It has more data than the Ram one, but only says E-In Production. I had thought that the Google Doc was going to get more precise updates..like F-status, G-status, etc.
Those changes happen too fast to update. The primary build will be less than 24 hours. Then yours will go to body vendor for running boards and stickers. 1 day to a week, depending on work load. Generally 1 to 2 days, but a few 23s were a week.I've been checking that sight now also. It has more data than the Ram one, but only says E-In Production. I had thought that the Google Doc was going to get more precise updates..like F-status, G-status, etc.
My 2023 Laramie G/T was 7 days, I'm on day 5-6 on this 2024 Laramie G/T, so probably close to "Built".Those changes happen too fast to update. The primary build will be less than 24 hours. Then yours will go to body vendor for running boards and stickers. 1 day to a week, depending on work load. Generally 1 to 2 days, but a few 23s were a week.
This just in from my dealership...
Sure, here's what I have...So jealous, you've been spared from the strike! Mind sharing your complete timeline? (ordered --> confirmed --> etc.)?
Thank you
Thank you. I assume the "In production - 9/1" status was reflected on 9/1? or did it change to "in production" after 9/1, showing that date retroactively?Sure, here's what I have...
I must be getting close, the Ram Vehicle Tracking, finally has a picture of my truck, so I was able to update my avatar.
I got a Text on 9/2 afternoon that it was In Production. I got an email on 9/02 evening that it was In Production..the Tracker, which showed it had started the day prior, on 9/01.Thank you. I assume the "In production - 9/1" status was reflected on 9/1? or did it change to "in production" after 9/1, showing that date retroactively?
I hear you!All I want is for my truck to preferably clear the assembly line before the strike, or less preferably get delayed until after the strike. But definitely not gets stuck on the assembly line as the strike hits. I can already foresee how many issues I will have with it if it's left half built as they walk off...