Start of 2022 Production.

I currently still am able to find 362431 orders, of which they have built 311888 trucks leaving 50543 trucks left to build.

However, what isnt publicly available is whether an order is canceled or not so there could be many of these that wont ever be built and I just wont know that until some point in the future where I am only finding 2023 builds and no 2022. There was nearly 2 months of overlap between the 2021/2022 transition so that doubles the scanning required during that period.


Here is the breakdown of the remaing 50543 trucks

Big Horn / Lonestar
22677​
Laramie
8316​
Limited
6115​
TRX
5213​
Rebel
3165​
Tradesman
1986​
Sport
1728​
Longhorn
1291​
Tradesman HFE
52​

Below is the current VIN group chart as of today (average VIN group completion below 400 is at 94%) You can see how many are still left to be built in the older groups and are more likely to be cancelled orders, but not guaranteed. This month alone we have had 3 trucks from the 103 group built which would have been ordered nearly 15± months ago??

1661804157006.png
 
Thanks for the info! I’m one of the 3165, 2022 Rebels still waiting. I ordered back on 6/25/22 and was told release date of 9/21/22. Patiently waiting….
 
1072 Build Sheets found today. 1 more forum members with a truck starting production! Congratulations to @truckless

Going to need to change your name soon!

VINBSWSBStoWSSTATECOLORSERIES
314940 @TrucklessXAlbertaBlackLimited
 
Where is the tracker? I ordered a Back Country from MD earlier this month...
 
I'm surprised that there were any build sheets today. Knightmare reported (on the TRX forum) that production was down yesterday because of a lack of suspension parts.
 
Do they focus on different models at different times? I ordered a laramie, looking at the spreadsheet I see limiteds in production that were ordered at the same time or after I did
 
Do they focus on different models at different times? I ordered a laramie, looking at the spreadsheet I see limiteds in production that were ordered at the same time or after I did

More expensive is built faster (generally, not counting TRX).

Limiteds will be built within a few weeks of ordering. Laramies in the middle. Big Horns... well I ordered in May and my build date estimate is 9/21.
 
The cost really doesnt have anything to do with the wait until production begins

Here is the average delay for all series to date that were issued AFTER production of the 2022's began. Almost all trucks outside the TRX fall in that 50-60 day range.

SeriesQty BuiltBuild Wait
Big Horn / Lonestar
118378​
54.1​
Laramie
56931​
56.1​
Limited
28257​
51.5​
Rebel
22631​
61.6​
TRX
13529​
84.2​
Sport
10118​
51.2​
Longhorn
8828​
54.0​
Tradesman
4830​
53.6​
Tradesman HFE
33​
73.0​
 
Ah, now we need a scatter-graph chart with the X axis as "MSRP" and the Y axis as "order-to-build duration". That will definitively prove whether there's a correlation!
then pump it into an ANOVA to find any significant results :)....me just being a big horn order wishing I chose a higher trim....
 