Just curious about the timing of production and Build sheet and Window sticker. Asking this because my build sheet was issued one day and the window sticker the next day. My build sheet was issued on Friday 5/13 and window sticker on Saturday 5/14. And this included going to the accessory plant to have the Bed Utility Group installed. I know it has been posted that target production is around 1,400 trucks per day, but I do not know the number of "steps" it takes to build the truck.
Does anyone know how long it takes for a truck to be produced ?
- No accessories, just normal production line.
- From very start to finish off the line
Is the Build sheet issued before the truck starts production or after some point in production ?
- Triple B normally says "5 more forum members with trucks starting production" when he finds a build sheet
Is the Window sticker issued after the truck is totally finished and ready to be shipped ?
- Triple B normally says " 2 more forum members with trucks on the way!" when he finds a window sticker
@triple_B ,
@Eighty ,
@RamCares