5thGenRams Forums

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

Start of 2022 Production.

just stopped at dealership,my truck is sitting in detriot,waiting for a truck
sure hope it gets here soon.eta 12-16 to 12-20
 
just stopped at dealership,my truck is sitting in detriot,waiting for a truck
sure hope it gets here soon.eta 12-16 to 12-20
I don't know where you live, but if it is anywhere outside the Detroit metro area, I'd guess you aren't going to get it by the 20th.
 
I don't know where you live, but if it is anywhere outside the Detroit metro area, I'd guess you aren't going to get it by the 20th.
im in pennsylvania,near pittsburgh
 
There seems to be some debate on this. And to be honest, I think I've seen it happen both ways. I suspect that the build sheet comes out after main assembly (and before body vendor), but occasionally the body vendor is done so quickly that no one found the build sheet before it was done.
I think that second scenario was the case with mine. I never saw it go to the body vendor, it was in inspection really quickly after getting a BS.
So, Eighty is correct and it can look to be both ways because of the timing. The BS is released after the main assembly line and before the body vendor, but they also are only released the morning after it finishes the main assembly line so if it finishes the line early enough in the day then it can go to accessories and be returned late that same day which will look like that happened before the BS was released since we still won't get it until the next morning.
 
Been there, done that. He went straight to the factory and that is where my first promised build of the week of 11/29 came from. That came and went. I emailed him the next week on 12/08 telling him I was disappointed and was curious what my new date was since that one passed. It was the next day I heard from Ram Support about my current series of build weeks. He has still not responded to my last email and whenever I call there, he is always busy or has the day off.
Do what I am doing, start looking at truecar, cars.com and autotrader. There are alot of 22's out there already just got to find the one you want.
 
Anybody else ready to pull their hair out because of all the contradicting information between what the dealers see and what’s on the ram trucks website/app? This is what I received today from my dealer, which doesn’t match the website/app, specifically the level A/B - Level 1/2 equipment groups.

And now I have a decision to make considering the Laramie with the ORG is now almost $2k less than a similarly equipped Rebel. Any opinions? 😄
 

Attachments

  • B41B1B93-E9B8-40F9-9278-1FB7E47E8ADA.jpeg
    B41B1B93-E9B8-40F9-9278-1FB7E47E8ADA.jpeg
    92.7 KB · Views: 57
  • 2AD08515-5337-4DA8-A2EE-1BDEFC3AEA5C.jpeg
    2AD08515-5337-4DA8-A2EE-1BDEFC3AEA5C.jpeg
    85.1 KB · Views: 57
Anybody else ready to pull their hair out because of all the contradicting information between what the dealers see and what’s on the ram trucks website/app? This is what I received today from my dealer, which doesn’t match the website/app, specifically the level A/B - Level 1/2 equipment groups.

And now I have a decision to make considering the Laramie with the ORG is now almost $2k less than a similarly equipped Rebel. Any opinions? 😄
you want a better site to compare

nada.com

costco.com
 
There seems to be some debate on this. And to be honest, I think I've seen it happen both ways. I suspect that the build sheet comes out after main assembly (and before body vendor), but occasionally the body vendor is done so quickly that no one found the build sheet before it was done.
I havr my build sheet currently and am still at body vendor "PENDING" the installation additional equipment. Got my buiod sheet 12/13
 
Also interesting that they are scheduled to run 25 hours in a row this Saturday from 9:30pm Friday to 10:30pm Saturday in 3 shifts
 
Also interesting that they are scheduled to run 25 hours in a row this Saturday from 9:30pm Friday to 10:30pm Saturday in 3 shifts
Aside from holidays and unexpected shortages, they have been running 24/7 since September 25th.
 

Users who are viewing this thread

Back
Top