Just joined and found out that I could track the progress, so here’s my build:
This will be my 4th ram, but first build.
2021 Laramie Night Edition, crew cab, 4x4, 5’7” bed, in Granite Crystal Metallic.
Level B equipment group, eTorque engine, 3.92 rear end, bed utility group, 12” Uconnect, trailer tow group, air suspension
Ordered on 3/4/21, and first contacted them on 4/5/21 and was given the VIN and advised that the materials are all there and the build should start soon.
What is the typical timeline of the builds?