Ram-a-Kin
Well-Known Member
- Joined
- Jan 27, 2022
- Messages
- 239
- Reaction score
- 127
- Points
- 43
- Age
- 64
FCA Affiliate Rewards
www.fcausaffiliates.com
Have to be a member of a business or group who have an affiliate agreement with RAM. There are few organizations which you can join for a fee. There is a "how to get the best price" thread. Go read through that and it will have all the info.stupid question - what's an affiliate number and does anyone have one to share?
No stupid questions. So this is what we're talking about https://www.fcausaffiliates.com/stupid question - what's an affiliate number and does anyone have one to share?
Brilliant thanks all - fingers crossed they'll first honor the original invoice priceThe Ram Incentives Line is 1-800-227-0757 as well. If you call them with your VIN/Zip Code then they can tell you all of the incentives available to you as well. They will give you the codes for them to pass along to your dealership so they don't miss any. They also told me that the dealership needs to be entering your legal name into the system (however it is spelled on your drivers license including any middle names).
I Ordered on 7-16-21 have VIN 7-17-21 and D1 on 1/12/22 Built on 2-2-22 and RAM chat had no Idea it was even built . I even have a Window Sticker Already conforming build date of 2-2-22.Same as what I was told last week by ramchat and my dealer. Dealer told me I'm D1 but not showing a date. All I can guess is at worst is another false flag
If you post what they say we can tell you where you are in the build process. Also, you can add your VIN to the tracker and get updates once production starts up through the point of getting a Window Sticker. https://docs.google.com/spreadsheets/u/1/d/1XAZCsecD67IBmQ1YUudQKWVcfGepUmK89RHyotukGBs/htmlview#My order is only a couple of weeks old but I was bored so I decided to check in with Ram Customer Chat. The rep was very friend and great to chat with. I guess they don't have access to status codes, but said all the parts for the truck are gathered and it is awaiting scheduling to be build. He suggested I check back in 4-6 weeks. Kinda neat to have the ability to check like that.
Thank you! They told me all the parts are gathered and it is awaiting build scheduling. I have added my vin to the tracker.If you post what they say we can tell you where you are in the build process. Also, you can add your VIN to the tracker and get updates once production starts up through the point of getting a Window Sticker. https://docs.google.com/spreadsheets/u/1/d/1XAZCsecD67IBmQ1YUudQKWVcfGepUmK89RHyotukGBs/htmlview#
So that's D status. The good news is that they've accepted your order as submitted and theoretically at least, it'll be built accordingly!Thank you! They told me all the parts are gathered and it is awaiting build scheduling. I have added my vin to the tracker.
I keep double checking my order worrying that I missed putting something on the sheet that I wanted.So that's D status. The good news is that they've accepted your order as submitted and theoretically at least, it'll be built accordingly!
I did that a lot too for the first 5 months after I orderedI keep double checking my order worrying that I missed putting something on the sheet that I wanted.
Thankfully all I missed was the decal delete. I’ll be pulling out the heat gun when I pick it up… lolI did that a lot too for the first 5 months after I ordered
I ran into a restriction on mine also and the next day it was clear. I would have your dealer to keep trying daily.I spoke with the sales manager of my local Ram dealer yesterday and was ready to order a Limited if it was available in Flame red like on Ram truck build website; he brought up the dealer connect build site on his computer and was surprised to see a restriction on both Hemi engines and diesel engine for the Limited & Rebel (my second choice) trims. He did not know how long the restrictions would be in place. I don't know about the other trims. I wonder if this has anything to do with the Inline turbo 6 engine; on wagoneerforums.org, a guy posted that when he ordered a Grand Wagoneer Series III, the standard 6.4L Hemi engine for the GW was not allowed to order; he had to pay a $2000.00 engine upcharge for the Inline6 before the order would be accepted.
You still have a build sheet - it works for me. Don’t use lower case letters…has to be uppercase.My 2022 rebel order has been in the quality checks phase for over 20 days so far, according to Ram chat. Is this normal? Additionally, I was able to pull up my build sheet 2 weeks ago, but now the build sheet is no longer found. No window sticker either. The VIN is 1C6srfltxnn119845. Anyone have any ideas what may be happening?
Normal - AbbyNormal maybe - Mel Brooks reference. I was there for so long 30sih and others longer. No, as for the reason. Even if its been there that long, double/triple check things when it arrives. Mine is back to the shop for a paint job. Factory messed it up. Little smudge on drivers door and missing paint at the same place.My 2022 rebel order has been in the quality checks phase for over 20 days so far, according to Ram chat. Is this normal? Additionally, I was able to pull up my build sheet 2 weeks ago, but now the build sheet is no longer found. No window sticker either. The VIN is 1C6srfltxnn119845. Anyone have any ideas what may be happening?
You still have a build sheet - it works for me. Don’t use lower case letters…has to be uppercase.
The average BS-WS duration is 5.5 days (median 2 days), so yours is definitely taking longer. Could be any number of reasons. Something failed inspection and they have to repair or replace it, or you could just be stuck in the back end of the facility and they’ll get to it when they get to it.