In all fairness, RAM had outstanding communication with me when I ordered my 2015 3500. From the date of order to the day the 3500 was in my driveway, 6 weeks and 5 days. Like your Lexus order, this was well before COVID, supply chain issues, and worker shortages.I had a similar experience with Lexus. The wife wanted a new car, so we ordered through Lexus. Everything was easy, they did exactly what they said they would, and they delivered early. And the whole process was incredibly quick. Great communication the whole time. If they can do it, why can’t Stellantis?
Any idea what transport system is used truck and rail? Trying to see if I can track my vehicle.
Lexus is a Toyota brand, and they don't take custom orders. You may order your exact build from the dealer, but they don't go to the factory and ask for it to be built that way. They go to the inventory system and see where a build like that is (or when one like it will come out of the factory). So it's not an apples-to-apples comparison. Locating and shipping a car - that is already built - is much different than building a car to an exact specification.I had a similar experience with Lexus. The wife wanted a new car, so we ordered through Lexus. Everything was easy, they did exactly what they said they would, and they delivered early. And the whole process was incredibly quick. Great communication the whole time. If they can do it, why can’t Stellantis?
Yeah, we’re technically in Mount Pleasant. Our home is almost 4x in price at the moment. It’s crazy.My son just built a house there. Housing prices have gone through the roof!!!
It's not specific "chips". It's shortages on the stuff that microchips are made from and unfortunately a modern vehicle has hundreds of them in it.I'm not sure what chips run what and what they are short on, but the Advanced Safety Group just got added back to the Laramie. So they must be getting certain chips that allow them to add these features back to the orders. That was one of the reasons I canceled my original order and ordered a new one this week.
The one (so far) I have talked to, said 6 months for a TRX (which is what I REALLY want) or 6-8 weeks for a Laramietalk to your dealer,
6 months is not true for a TRX, unless you're taking a dealer-stock order. The true wait times are no different for a TRX than they are for other DT trucks. Anywhere from 7 months+ to 2 weeks.The one (so far) I have talked to, said 6 months for a TRX (which is what I REALLY want) or 6-8 weeks for a Laramie
6 months is not true for a TRX, unless you're taking a dealer-stock order. The true wait times are no different for a TRX than they are for other DT trucks. Anywhere from 7 months+ to 2 weeks.
Why not extend the lease month to month until the ordered truck arrives?Sheesh. I may just have to pick something off of the lot when my lease ends.
As an example, there have been 268 TRX's produced with VINs that were issued after 12/1/21 (i.e., less than two months old). Six of those are January VINs.Sheesh. I may just have to pick something off of the lot when my lease ends.
that stuff is supposed to be thrown outSo I noticed when I took delivery, the dealer gave me the keys with the vehicle shipping order.
At the bottom of the order it says HOT VEHICLE
Has anyone seen this if the report was provided to you?
Sent from my iPhone using Tapatalk
Why not extend the lease month to month until the ordered truck arrives?
That's what I've been doing for the last 2 months
As an example, there have been 268 TRX's produced with VINs that were issued after 12/1/21 (i.e., less than two months old). Six of those are January VINs.
Yes. The VIN is issued when the factory accepts the order. The BS is issued after the truck comes off the production line. The WS is issued after the truck passes final inspection and is invoiced to the dealer (i.e., it's released for shipping).If I have been reading it right, first is the VIN, then the BS and lastly the WS?
Correct. You should get the VIN a few days after ordering. Then the Build Sheet (BS) will be available when it is built. In another 2 - 3 days the Window Sticker (WS) should become available. Of course those are estimates, things can change and issues come up changing those timelines.If I have been reading it right, first is the VIN, then the BS and lastly the WS?