5thGenRams Forums

Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

Start of 2022 Production.

Someone on here said it before and I'd agree - it's by region.

I think they'll market it and say "2022 RAM 1500s are now available starting Oct". In that way it makes sense to start shipping to dealers further away since it takes longer for them to get there. My truck is built and I'm 2 transit days away from SHAP and that's what's making me feel better about others getting their stickers now.

That and they are re-writing rebates and deals so we don't any discounts. :)
Yeah, my dealer lot has been taking 2022 deliveries all week. Their site has a handful already. I hope they accept affiliate and employer discounts at delivery. On the dealer site, it says "Call for Pricing" at the Employee pricing section.
 
There is no build sheet with the word offroad, off road, off-road, etc Maybe a little more information on what you are looking for exactly though would help. Do you have a copy of your POC ?
Sure, here you go
 

Attachments

You are correct, thanks for catching that. That's what I get for trying to do that search from my phone, it was autocorrecting Road to road I didn't think much of it but apparently my search is case sensitive.

Back at my desk now, and if I search for "Off Road Group" there have been 322 trucks built so far, 46 have shipped.
 
If I weren’t too fat and/or uncoordinated I would literally be flipping with happiness, yes. I’ll settle for sitting quietly and celebrating with a stiff drink.
It better be a scotch aged at least 14 years (I would typically say at least 18 years, but Glenlivet makes a special 14-year single malt the proceeds of which go to the Purple Heart Foundation, and it is actually a very good scotch that is finished in cognac casks]).
 
If I weren’t too fat and/or uncoordinated I would literally be flipping with happiness, yes. I’ll settle for sitting quietly and celebrating with a stiff drink.
I'm with ya man. I'm pretty much going to wait until the end of October. That would put me at 4 1/2 months. At that point, I'm going let my dealer, ramtrucks.com, and make some phone calls to customer service and let them know that building other trucks besides ordered trucks isn't acceptable, and I will cancel my order and buy another maker's trucks. With links and all



2022 Big Horn Back Country
6/14…order placed
6/24…D status and Vin

2016 Dodge Charger scat pack and my spouse 2021 Jeep Wrangler Unlimited Sahara
 
I'm with ya man. I'm pretty much going to wait until the end of October. That would put me at 4 1/2 months. At that point, I'm going let my dealer, ramtrucks.com, and make some phone calls to customer service and let them know that building other trucks besides ordered trucks isn't acceptable, and I will cancel my order and buy another maker's trucks. With links and all



2022 Big Horn Back Country
6/14…order placed
6/24…D status and Vin

2016 Dodge Charger scat pack and my spouse 2021 Jeep Wrangler Unlimited Sahara
Well, I ordered on 27 May. My truck has been built. It has been sitting in Inspection for 2 weeks. Could be another week. Then to JB for a couple of weeks to get stuff installed and then maybe 3 weeks shipping.
Realistically I might not see my truck until the middle of November and it is built.
 
Are there any build sheets or window stickers of Longhorns with post package changes that show the tech features included in the level 1? Any Southforks produced? Can you guys tell?
 
Last edited:
I'm with ya man. I'm pretty much going to wait until the end of October. That would put me at 4 1/2 months. At that point, I'm going let my dealer, ramtrucks.com, and make some phone calls to customer service and let them know that building other trucks besides ordered trucks isn't acceptable, and I will cancel my order and buy another maker's trucks. With links and all



2022 Big Horn Back Country
6/14…order placed
6/24…D status and Vin

2016 Dodge Charger scat pack and my spouse 2021 Jeep Wrangler Unlimited Sahara
Im excited to see my truck... But same, if im not SEEING the truck in november, id be inclinced to testdrive a 1794 tundra when they show up in december
 
You are correct, thanks for catching that. That's what I get for trying to do that search from my phone, it was autocorrecting Road to road I didn't think much of it but apparently my search is case sensitive.

Back at my desk now, and if I search for "Off Road Group" there have been 322 trucks built so far, 46 have shipped.
Thank you @triple_B & @Eighty
 
I'm with ya man. I'm pretty much going to wait until the end of October. That would put me at 4 1/2 months. At that point, I'm going let my dealer, ramtrucks.com, and make some phone calls to customer service and let them know that building other trucks besides ordered trucks isn't acceptable, and I will cancel my order and buy another maker's trucks. With links and all



2022 Big Horn Back Country
6/14…order placed
6/24…D status and Vin

2016 Dodge Charger scat pack and my spouse 2021 Jeep Wrangler Unlimited Sahara
I'm with you there, I'll be sure to get my "non-refundable" $1000 back somehow and go elsewhere. I'm already down a car (understandably my fault for trading in to lock in the value) but I need a truck for towing.
 
I'm with you there, I'll be sure to get my "non-refundable" $1000 back somehow and go elsewhere. I'm already down a car (understandably my fault for trading in to lock in the value) but I need a truck for towing.
I hear you but I honestly don't think it's going to matter much where you go, it will take a long-*** time no matter what with the way things are. Unless you get one off the lot, but then you're likely to be paying at least MSRP.

So I think it really depends on just how badly you need it.
 
I'm with ya man. I'm pretty much going to wait until the end of October. That would put me at 4 1/2 months. At that point, I'm going let my dealer, ramtrucks.com, and make some phone calls to customer service and let them know that building other trucks besides ordered trucks isn't acceptable, and I will cancel my order and buy another maker's trucks. With links and all



2022 Big Horn Back Country
6/14…order placed
6/24…D status and Vin

2016 Dodge Charger scat pack and my spouse 2021 Jeep Wrangler Unlimited Sahara
I’m with ya. Ordered back in May and there’s nothing special about my order. Painful to see all these trucks ordered in July / August getting built first. I’m not in a rush but it just sucks waiting around.
 
You are correct, thanks for catching that. That's what I get for trying to do that search from my phone, it was autocorrecting Road to road I didn't think much of it but apparently my search is case sensitive.

Back at my desk now, and if I search for "Off Road Group" there have been 322 trucks built so far, 46 have shipped.
Mine was ordered with the "Off-Road Group" and shipped yesterday.
 

Users who are viewing this thread

Back
Top