Royalist_Ram
Ram Guru
Order Placed - Nov 23
VIN / VON / Placed in (D) Status - Nov 24
Parts Acquired and Ready to Build (D1) - Dec 30
Build Date - No Idea Yet, still no Window Sticker
Equipment List (Build Sheet) - Jan 14
Still in Inspection (I) since Jan 14th
Conflicting Info from Ram Care / Ram Chat / Dealer
So I’ve been in the (I) Stage for quite some time. There are trucks built on 1/18 (after mine) and arrive days later and are already sold at my dealer, yet mine built before is still in inspection. Others are in paint and ship 2 days later. Waiting for Mopar Accessories? Allocations? I have no idea. Dealer told me estimated ship date is 1/19 with a total time from order placed to arrive at dealer being 4-6 weeks. Was told inspection can take up to 14 days, at day 21 now.
Just wondering how long this inspection status takes for you all, and if there is something wrong, thanks!
VIN / VON / Placed in (D) Status - Nov 24
Parts Acquired and Ready to Build (D1) - Dec 30
Build Date - No Idea Yet, still no Window Sticker
Equipment List (Build Sheet) - Jan 14
Still in Inspection (I) since Jan 14th
Conflicting Info from Ram Care / Ram Chat / Dealer
So I’ve been in the (I) Stage for quite some time. There are trucks built on 1/18 (after mine) and arrive days later and are already sold at my dealer, yet mine built before is still in inspection. Others are in paint and ship 2 days later. Waiting for Mopar Accessories? Allocations? I have no idea. Dealer told me estimated ship date is 1/19 with a total time from order placed to arrive at dealer being 4-6 weeks. Was told inspection can take up to 14 days, at day 21 now.
Just wondering how long this inspection status takes for you all, and if there is something wrong, thanks!