piening2150
Ram Guru
- Joined
- Jan 31, 2020
- Messages
- 668
- Reaction score
- 698
- Points
- 93
- Age
- 50
BTW OP-
1- Most orders take about 6 weeks or so to be delivered, so the thread was premature to begin with. Anyone that bought off the lot (like me) the build dates will likely be even older.
2- Sterling Heights was shut down from Xmas till the end of January for standard Xmas break + TRX related upgrades (and likely to thin out excess inventory already in the pipeline), so you probably won't get much of anybody with a 2020 build date yet. If you stop yelling at everyone who posts, maybe some will contribute meaningful data in the coming months.
3- For the record, I bought my '20 on 1/29/20 and the build month was Oct '19. No issues yet in the 350 miles or so I've driven it.
1- Most orders take about 6 weeks or so to be delivered, so the thread was premature to begin with. Anyone that bought off the lot (like me) the build dates will likely be even older.
2- Sterling Heights was shut down from Xmas till the end of January for standard Xmas break + TRX related upgrades (and likely to thin out excess inventory already in the pipeline), so you probably won't get much of anybody with a 2020 build date yet. If you stop yelling at everyone who posts, maybe some will contribute meaningful data in the coming months.
3- For the record, I bought my '20 on 1/29/20 and the build month was Oct '19. No issues yet in the 350 miles or so I've driven it.
Last edited: