rsonedecker
Well-Known Member
- Joined
- Dec 12, 2018
- Messages
- 280
- Reaction score
- 140
- Points
- 43
- Age
- 52
First and foremost, I appreciate any feedback - this website (constantly searching and reading) has been an invaluable resource for me.
I’m planning to order a Laramie 4x4 short bed in as soon as a couple weeks (depending on some responses here) as my current lease will be up in April and trying to time the build appropriately. Below is the planned option list, and from that I was looking for opinions on:
1. what is the current build time for these trucks (order-to-delivery) – dealership is telling me 6-8 weeks, but I read mixed results on here that indicate it’s longer. Will the long plant shutdown cause a start-up delay when they start building them again?
2. do any of the options below extend my build time? (seen indicators that Rambox and/or Bed Utility might?)
3. Is there anything I need to concern myself with around any of my options? I’ve read that trucks aren’t coming with the hardware in order to make use of the bed extender feature, is that still an issue? Other concerns I need to address with the dealership?
4. Should I wait for Feb rebates (cleveland auto show will be end of Feb here) - My dealership has indicated they can lock the rebates so that I get the "best", but I believe that is either what they are at time or order, or what they are at time of delivery, not necessarily what they are in between those two times. Currently get $2000+$1000+$500 conquest lease.
Planned Build:
2019 Ram 1500 Laramie Crew Cab 4x4 5’7” Box
5.7-Liter V8 Hemi MDS VVT Engine (EZH)
Flame Red
Equipment:
Level 1 Equipment Group (A66)
Sport Appearance Package (AEF)
RamBox Cargo Management System (XB9)
Rear Wheelhouse-Liners (MWH)
Panoramic Sunroof (GWJ)
Uconnect 4C NAV with 8.4-Inch Display (UAV)
Anti-Spin Differential (DSA)
3.92 Rear Axle (DMH)
Tri-Fold Tonneau Cover (CS7)
Bed Utility Group (ANT)
Front and Rear Rubber Floor Mats (CLF)
33-Gallon Fuel Tank (NFF)
Trailer Brake Control (XHC)
I’m planning to order a Laramie 4x4 short bed in as soon as a couple weeks (depending on some responses here) as my current lease will be up in April and trying to time the build appropriately. Below is the planned option list, and from that I was looking for opinions on:
1. what is the current build time for these trucks (order-to-delivery) – dealership is telling me 6-8 weeks, but I read mixed results on here that indicate it’s longer. Will the long plant shutdown cause a start-up delay when they start building them again?
2. do any of the options below extend my build time? (seen indicators that Rambox and/or Bed Utility might?)
3. Is there anything I need to concern myself with around any of my options? I’ve read that trucks aren’t coming with the hardware in order to make use of the bed extender feature, is that still an issue? Other concerns I need to address with the dealership?
4. Should I wait for Feb rebates (cleveland auto show will be end of Feb here) - My dealership has indicated they can lock the rebates so that I get the "best", but I believe that is either what they are at time or order, or what they are at time of delivery, not necessarily what they are in between those two times. Currently get $2000+$1000+$500 conquest lease.
Planned Build:
2019 Ram 1500 Laramie Crew Cab 4x4 5’7” Box
5.7-Liter V8 Hemi MDS VVT Engine (EZH)
Flame Red
Equipment:
Level 1 Equipment Group (A66)
Sport Appearance Package (AEF)
RamBox Cargo Management System (XB9)
Rear Wheelhouse-Liners (MWH)
Panoramic Sunroof (GWJ)
Uconnect 4C NAV with 8.4-Inch Display (UAV)
Anti-Spin Differential (DSA)
3.92 Rear Axle (DMH)
Tri-Fold Tonneau Cover (CS7)
Bed Utility Group (ANT)
Front and Rear Rubber Floor Mats (CLF)
33-Gallon Fuel Tank (NFF)
Trailer Brake Control (XHC)
Last edited: