Start of 2022 Production.

JPM1

Member
Joined
Apr 20, 2022
Messages
6
Reaction score
11
Hello All! I just ordered a 2022 Pat Blue Limited 1500. What has been the typical delivery time for a custom order? If this is the wrong thread to ask this question, let me know and I’ll will continue to look.
Thx!
JP
 

ManchuWarrior

Well-Known Member
Joined
Apr 11, 2022
Messages
205
Reaction score
194
Hello All! I just ordered a 2022 Pat Blue Limited 1500. What has been the typical delivery time for a custom order? If this is the wrong thread to ask this question, let me know and I’ll will continue to look.
Thx!
JP
As I'm waiting as well, from reading the forums it's all over the place. I've seen as soon as 9 or 10 weeks to folks waiting over a year. Seems the sweet spot is 16 weeks.

Thanks for ordering Pat Blue as I too ordered one in early April. If true I read that they like to group colors in batches so the more Pat Blue orders I see it may help my order. 🤣
 

FullMilRight

Member
Joined
Feb 27, 2022
Messages
12
Reaction score
14
Hello All! I just ordered a 2022 Pat Blue Limited 1500. What has been the typical delivery time for a custom order? If this is the wrong thread to ask this question, let me know and I’ll will continue to look.
Thx!
JP
I ordered in March and it’s ready for shipping. Shipping is the crap shoot. I’m not stressing about it though and feel like mid to late May is a good time frame for me. Beginning to “possible” driveway could be 2.5 months which ain’t bad.
 

speedgeek

Member
Joined
Apr 5, 2022
Messages
24
Reaction score
10
Hi There... First post....

I have a couple of questions about the whole ordering process.

1. Do the dealers have to order in batch? The reason I ask is that from the time I had everything lined up with the dealer with options and such to when the order was actually placed in the system with Ram (I was given the order date from RamCares Chat) was about 2-3 weeks. That was with me asking for updates. I was wondering if there was a minimum order quantity that a dealer has to put in at any given time when ordering for a customer.

2. Besides the chip shortage (and the foam insert shortage) are there other shortages which are causing issues with builds being scheduled. I am still apparently in D status/"In the scheduling process" with no ETA in sight. I know there are people who have waited longer. The dealer had said likely 6 to 8 weeks to get the truck, but based on what I have been seeing in the threads I know that is wind up the skirt. The build I asked for was pretty vanilla I think(?), though unlike most other people, I went with the V6 and the 3.21 gear as this is mostly going to be a Highway cruiser for me and the Mrs. I never haul much, I never tow anything.

Just getting curious as to how this all gets mapped out.
 

1.21gigawatts

7-Stringer
Joined
Dec 29, 2021
Messages
989
Reaction score
1,340
Location
Boston, MA
Well, since I only got the driver’s side foam cup holder, I decided to repurpose it. Told the wife it was a free option for NRA members. That way she doesn’t feel left out. It actually works quite well. Are you sure it’s really a cup holder?

View attachment 127020
Will this fit an HK VP-40? :LOL: (hahah just wanted to start a which holster fits my gat tangent :ROFLMAO: :ROFLMAO: )
 

MartyIA

Active Member
Joined
Mar 13, 2022
Messages
44
Reaction score
31
I ordered in March and it’s ready for shipping. Shipping is the crap shoot. I’m not stressing about it though and feel like mid to late May is a good time frame for me. Beginning to “possible” driveway could be 2.5 months which ain’t bad.
Ordered mine 3/9 and it was delivered to dealer Saturday 4/16. Picked up Monday.
 

truckless

Well-Known Member
Joined
Sep 5, 2021
Messages
281
Reaction score
336
Location
Alberta, Canada
Hi There... First post....

I have a couple of questions about the whole ordering process.

1. Do the dealers have to order in batch? The reason I ask is that from the time I had everything lined up with the dealer with options and such to when the order was actually placed in the system with Ram (I was given the order date from RamCares Chat) was about 2-3 weeks. That was with me asking for updates. I was wondering if there was a minimum order quantity that a dealer has to put in at any given time when ordering for a customer.

2. Besides the chip shortage (and the foam insert shortage) are there other shortages which are causing issues with builds being scheduled. I am still apparently in D status/"In the scheduling process" with no ETA in sight. I know there are people who have waited longer. The dealer had said likely 6 to 8 weeks to get the truck, but based on what I have been seeing in the threads I know that is wind up the skirt. The build I asked for was pretty vanilla I think(?), though unlike most other people, I went with the V6 and the 3.21 gear as this is mostly going to be a Highway cruiser for me and the Mrs. I never haul much, I never tow anything.

Just getting curious as to how this all gets mapped out.

That's what I was told too ;) All I can say....hope for the best, plan for the worst. Just don't hold your breath. 😵‍💫
 

bigdodge

Happy Ram Owner
Joined
Aug 25, 2021
Messages
4,126
Reaction score
2,622
Location
southwest. where majority rules
Hi There... First post....

I have a couple of questions about the whole ordering process.

1. Do the dealers have to order in batch? The reason I ask is that from the time I had everything lined up with the dealer with options and such to when the order was actually placed in the system with Ram (I was given the order date from RamCares Chat) was about 2-3 weeks. That was with me asking for updates. I was wondering if there was a minimum order quantity that a dealer has to put in at any given time when ordering for a customer.

2. Besides the chip shortage (and the foam insert shortage) are there other shortages which are causing issues with builds being scheduled. I am still apparently in D status/"In the scheduling process" with no ETA in sight. I know there are people who have waited longer. The dealer had said likely 6 to 8 weeks to get the truck, but based on what I have been seeing in the threads I know that is wind up the skirt. The build I asked for was pretty vanilla I think(?), though unlike most other people, I went with the V6 and the 3.21 gear as this is mostly going to be a Highway cruiser for me and the Mrs. I never haul much, I never tow anything.

Just getting curious as to how this all gets mapped out.
sunroof
sheet metal
some paint colors
seat fabric
seat color

are just some of the supply issues causing a delay
 