Konrad
Well-Known Member
- Joined
 - Oct 29, 2019
 
- Messages
 - 214
 
- Reaction score
 - 170
 
- Points
 - 43
 
- Age
 - 52
 
I have a question. When you do a change in AlfaOBD that has multiple changes like adding a brake controller do you only change one option at a time and exit everything and then go back in or can you do all the changes at once then exit everything?
Old post, but I thought I'd share my experience. I don't think that matters as long as you wait for each operation to display the "completed" message. I did all in one sequence, one option after another. Turned the truck off and immediately on. Worked like a charm.
Sent from my iPad using Tapatalk