I am a soon to be Ram owner. So excited. Truck is currently in D1 status. Ship date of 3/19 given but not sure how firm that is. Been on order fo

Tom W

New Member
Joined
Mar 13, 2021
Messages
1
Reaction score
1
I am a soon to be Ram owner. So excited. Truck is currently in D1 status. Ship date of 3/19 given but not sure how firm that is. Been on order for 5 weeks. Does anyone have any experience with the build sequence?
 

Neurobit

RAM Sorcerer
Joined
Jul 9, 2018
Messages
5,212
Reaction score
4,301
Location
Texas
I am a soon to be Ram owner. So excited. Truck is currently in D1 status. Ship date of 3/19 given but not sure how firm that is. Been on order for 5 weeks. Does anyone have any experience with the build sequence?
Welcome to the forum and congratulations!! It will be here before you know it!

Pls add your truck's (future) vitals to your signature when you have a moment. This will make it easier for other folks to help in case you have questions or concerns once you get your vehicle.

Cheers,
 

Snofire

Ram Guru
Joined
Jan 11, 2021
Messages
949
Reaction score
625
Location
WI
Congrats and welcome to the forums. You can head over here and see what other guys are experiencing but typically 7-9 weeks (possibly longer).

 

Big Tup

Active Member
Joined
Feb 26, 2021
Messages
84
Reaction score
20
Location
Leesburg, VA
I am a soon to be Ram owner. So excited. Truck is currently in D1 status. Ship date of 3/19 given but not sure how firm that is. Been on order for 5 weeks. Does anyone have any experience with the build sequence?
Hi,
I dont have experience with build sequence, as i am trying to learn by reading these threads. I ordered a limited longhorn 10th anniversary edition on 2/23/21 and it's still in D status. What did you order and when? Not sure if you have seen this before, but below is an outline (with definitions) of each build status.

Not Scheduled yet

BA New order that hasn't been checked
BB review by fleet department
BD special equipment processing
BE edit error
BG passed edit n/a for schedule
BGL edit ok parts unavailable
BX passed edit available for schedule
ZA Canceled

Scheduled:

C sub firm
D firm schedule - dealer has allocation and all parts available
D1 gateline schedule - scheduled to be built

Assembly Line:

E frame
F paint
G trim

Assembly Completed:

I built not ok'd
J built ok'd
JB shipped to body vendor
JE emission check
JS shipped to storage
KZ released by plant , invoiced

Shipping Status:

KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ-P - Arrived Ship - Thru Body Vendor
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction

B - Your order exists but isn't fully confirmed yet. Plant doesn't know about it yet. Systems are checking the order to ensure it's valid in terms of sales codes, Finance is checking to make sure the dealer has all their ducks in a row, etc.

C - Your order is "subfirm". The plant can see the order at this point but it's not fully committed to building as the supplier may or may not be able to get parts to the plant to build the truck. I am not sure of all the details on this state yet so I can't comment further.

D - Firm order. Your order now has a name instead of a number: A VIN! Materials should have been ordered by this point if all goes well, you should have a truck.

D1 - The date is set for your truck to be built. The plant knows when it should have parts sequenced for building and it should start to be built within 48 hours of the date set.

D2 - It's going to be built. The computers are being programmed, materials are being sequenced, framing is about to occur.

E - Frame. Metal is welded together to form the body and frame. The body is inspected at the end of this step to ensure it's within tolerances.

F - Paint. The metal is coated, primed, sprayed, clearcoated, polished, inspected, and hand finished if necessary.

G - Trim. The engine is installed in the chassis, the interior is installed, the chassis is mated to the body, the bed is put on. At the end of this, your truck is built.

I - Inspection. Your truck goes through a battery of shakedown tests and measurements are taken to ensure the vehicle looks and performs as expected.

JB - Body Vendor. The vehicle is sent off site to have a spray liner put in, steps, etc.

JS - Storage. Some of you call this "Prison". I like to think of it as QA trying to ensure you get what you expected. Typically if something happens or is found in the I step (or even a previous step), it goes here to get checked and fixed. A panel looks off color, a part on your truck was in the same batch as a bunch of failed parts, a light doesn't turn on, etc will all cause the truck to get sent here for a detailed inspection and fix.
Another reason it can end up here is either the dealer has asked to have the trucked delayed (it has a full lot and can only handle so many) or it has a special event coming up. Typically that isn't done on a sold order. It can also end up here at the start of a model year where production is ramping up but the vehicle has not be released (or certified) for shipment.

KZ - Shipment. The truck is ready to be shipped. The dealer is actually charged for the truck. As you all know, this can be a source of delay. Typically you see me put two statuses here: Awaiting Shipment and "Staged for Shipment". The first means it is in the general shipping yard waiting to be pulled to be put on a truck and/or train. The second means it has been pulled to be put on a truck and/or train but it hasn't actually got on the truck or train yet. There are a ton of substatuses here to track the status of the vehicle as it makes its way through the shipping system. KZX is the only one that you really care about as that means it was delivered to the dealer.
 

Yangster

Active Member
Joined
Nov 9, 2020
Messages
186
Reaction score
122
Hi,
I dont have experience with build sequence, as i am trying to learn by reading these threads. I ordered a limited longhorn 10th anniversary edition on 2/23/21 and it's still in D status. What did you order and when? Not sure if you have seen this before, but below is an outline (with definitions) of each build status.

Not Scheduled yet

BA New order that hasn't been checked
BB review by fleet department
BD special equipment processing
BE edit error
BG passed edit n/a for schedule
BGL edit ok parts unavailable
BX passed edit available for schedule
ZA Canceled

Scheduled:

C sub firm
D firm schedule - dealer has allocation and all parts available
D1 gateline schedule - scheduled to be built

Assembly Line:

E frame
F paint
G trim

Assembly Completed:

I built not ok'd
J built ok'd
JB shipped to body vendor
JE emission check
JS shipped to storage
KZ released by plant , invoiced

Shipping Status:

KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ-P - Arrived Ship - Thru Body Vendor
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction

B - Your order exists but isn't fully confirmed yet. Plant doesn't know about it yet. Systems are checking the order to ensure it's valid in terms of sales codes, Finance is checking to make sure the dealer has all their ducks in a row, etc.

C - Your order is "subfirm". The plant can see the order at this point but it's not fully committed to building as the supplier may or may not be able to get parts to the plant to build the truck. I am not sure of all the details on this state yet so I can't comment further.

D - Firm order. Your order now has a name instead of a number: A VIN! Materials should have been ordered by this point if all goes well, you should have a truck.

D1 - The date is set for your truck to be built. The plant knows when it should have parts sequenced for building and it should start to be built within 48 hours of the date set.

D2 - It's going to be built. The computers are being programmed, materials are being sequenced, framing is about to occur.

E - Frame. Metal is welded together to form the body and frame. The body is inspected at the end of this step to ensure it's within tolerances.

F - Paint. The metal is coated, primed, sprayed, clearcoated, polished, inspected, and hand finished if necessary.

G - Trim. The engine is installed in the chassis, the interior is installed, the chassis is mated to the body, the bed is put on. At the end of this, your truck is built.

I - Inspection. Your truck goes through a battery of shakedown tests and measurements are taken to ensure the vehicle looks and performs as expected.

JB - Body Vendor. The vehicle is sent off site to have a spray liner put in, steps, etc.

JS - Storage. Some of you call this "Prison". I like to think of it as QA trying to ensure you get what you expected. Typically if something happens or is found in the I step (or even a previous step), it goes here to get checked and fixed. A panel looks off color, a part on your truck was in the same batch as a bunch of failed parts, a light doesn't turn on, etc will all cause the truck to get sent here for a detailed inspection and fix.
Another reason it can end up here is either the dealer has asked to have the trucked delayed (it has a full lot and can only handle so many) or it has a special event coming up. Typically that isn't done on a sold order. It can also end up here at the start of a model year where production is ramping up but the vehicle has not be released (or certified) for shipment.

KZ - Shipment. The truck is ready to be shipped. The dealer is actually charged for the truck. As you all know, this can be a source of delay. Typically you see me put two statuses here: Awaiting Shipment and "Staged for Shipment". The first means it is in the general shipping yard waiting to be pulled to be put on a truck and/or train. The second means it has been pulled to be put on a truck and/or train but it hasn't actually got on the truck or train yet. There are a ton of substatuses here to track the status of the vehicle as it makes its way through the shipping system. KZX is the only one that you really care about as that means it was delivered to the dealer.

Hey Rappo,
FYI -- build sequence in my signature.

You can get updates via Ramchat...
 